Deconstruction of a Natural Gas Compression Station on behalf of GRT GAZ on the Auros site (33)
- Asbestos removal from roofs and facades
- Decontamination of the process
- Dismantling of processes:
° 1,500 tonnes of scrap
° 3,000 tonnes of concrete
° 5 Compressors
° 1 Water tower 30 meters high
° 1 Electrical substation
- Depollution of soil contaminated with hydrocarbons: 280 m3