Deconstruction of alumina production halls
Client: Rio Tinto
Dusting of 400 tonnes of alumina dust on the frames
Selective deconstruction of materials (basaltine, impacted bricks and concrete blocks)
Deconstruction of the metal frames of the halls and the electrical substation.
Equipment: 160 ton excavator with demolition arm and 12 ton clamp.